Skip to content

BVSD Central Kitchen & Education Center

The new 34,000 SF central kitchen features a loading dock with a fresh food processing area for deliveries from local farms, three food prep areas, over 7,000 SF of dry, refrigerated, and frozen food storage, a blast chill area, and administrative spaces. An on-site café serves scratch-cooked, locally sourced meals to the public and campus staff. The facility accommodates the ‘No Student Hungry’ bag program with a dedicated area for bag assembly, as well as conference space to host nutrition education and food literacy classes. Future plans include a teaching kitchen for cooking classes, special events, and seminars. The Education Center portion of the project included demolition of the east wing, a new two-story structure, and complete renovation of the remainder of the facility.

Details

Location

Boulder, CO

Size

45,000 SF

Owner

Boulder Valley School District

Market

Education

architect

Stantec