HDPE Pipe Fusion
Supply equipment and personnel to fusion weld 10,000 LF or 8” and 12” HDPE pipe for use in the mines gold cyanide leaching process. All materials were provided by client and JHL provided everything else to execute the work. The pipe fusion process included welds in 50′ sections, with flanges on both ends for a long lasting fit.
Details
Location
Confidential
Owner
Confidential
Market
Infrastructure
engineer
Owner Engineered