
Meridian Interconnect
This project connects Parker Water & Sanitation District’s Zone 2 distribution system to Meridian Metropolitan District’s Zone 2 distribution system. The construction included the installation of 860 linear feet of 12″ PVC C900 potable water pipeline, connections to existing potable water lines at both ends, and 120 linear feet of cement-lined ductile iron pipe around a precast valve vault with flow control equipment, along with SCADA system improvements.
Location
Parker, CO
Owner
Parker Water & Sanitation District
Market
Water/Wastewater
engineer
Jacobs Engineering Group
Related Projects
View All ProjectsAurora, CO
Highpoint Water & Sewer Bores
Watkins, CO
RMRP Water Treatment Plant
Commerce City, CO